Rocklin CA

If you have any additional pictures that you've taken of the construction, please give them to Steve Cyr, or email them to him at marthaandsteve@smctek.com

Aerial Views

Note that I've rearranged them so the most recent ones appear at the top. All of the aerial shots were taken by Cliff Ball from his own airplane.

March 6, 2008:

The parking lot is FINALLY paved!

February 1, 2008:

The whole site. This picture shows the progress on the roof and the parking lot areas, as well as Lake St Matthew in the lower right corner:

A blowup of the building, showing the roof in more detail. Tiles have been installed on most of the sloped roof areas, with the areas below the dormers still in progress:

January 13, 2008:

December 27, 2007:

December 14, 2007:

December 7, 2007:

Taken Friday afternoon from Cliff Ball's airplane after most of the roof trusses had been put up:

December 1, 2007:

The picture below shows the roof trusses that will be going up soon:

November 12, 2007:

Aerial view taken after the foundation footings have been poured, and the reinforcement rebar is in place. Everything is ready for the pouring of the slab - you can see that they've started pouring the slab on the left.

October 24, 2007:

The trenches have been dug for the foundation footings:

 

September 28, 2007

Sierra View has begun grading the site:

March 18, 2007

Before any work had been done at the site:

Back to the top of the page

November 14, 2007:

First, a view from the Chancel end of the sanctuary, The wooden cabinet on stilts appears to be a place to put the building plans to protect them from the weather.

This is the Chancel area of the sanctuary:

The Choir Room with the Bathrooms and Kitchen areas in the background:

The Sierra View Construction Office:

A couple of stacks of Preframed walls. About 30% of them are assembled and ready to stand up soon:

Looking across the Sanctuary end of the slab from behind the Choir Room:

One of the conduits that will contain the audio cables that will run from the Sound Booth to the Chancel:

The Sound Booth area, showing the conduits for the electrical and audio wiring:

This is the utility closet area. All of the electrical and other utilities come into the building here, then go out to the rest of the building.

Back to the top of the page

November 16, 2007:

Sierra View has stood up some of the walls, as shown in the next three pictures. These three pictures were taken with my cell phone, so they're not as sharp as the others.

Back to the top of the page

November 25, 2007

More pictures of the walls going up

 

Back to the top of the page

December 7, 2007:

Cliff Ball took this one on Friday morning as the Sierra View crew was installing the first of the roof trusses at the front end of the sanctuary:

Friday 12/7/07 in the afternoon: most of the roof trusses are in place now. The first three pictures below shows the end of the sanctuary from behind the chancel area - it shows the cross made by the windows - this cross will be visible from inside when you are seated in the sanctuary.

Below is the building from the sidewalk on the Lone Tree side of the property:

From the corner of the parking lot South of our property:

A whole row of earth-movers at the end of a day's work:

From the East side of the same parking lot:

From inside - the first shows the framing behind the chancel area - you can see that cross in the windows here too. The second picture is looking up at the roof trusses:

Looking toward the Narthex from the chancel area:

Another picture of the windows behind the chancel:

Back to the top of the page

December 8, 2007:

Cliff Ball took these two pictures on Saturday:

December 22, 2007

The roof trusses are almost complete, and the sheathing is being put on the roof and exterior walls:

This next picture is actually showing where the sound/video booth will be:

Looking toward the chancel area from between the sound/video booth and the "Cry Room:"

Back to the top of the page

January 11, 2008:

Our "Future Home" sign:

In these pictures you can see the crew installing the roofing paper in preparation for putting on the roof:

The dormers have been put on the roof:

\

Yet another shot of the interior of the sanctuary:

The electrical boxes have been installed in the sound booth. The top row on the left will the the light switches for the santuary. The big box (The grey thing you can see between the studs in the center of the picture) will have all of the sound system wires - speakers, audio signals, video, etc. The boxes closer to the floor will be power circuits.

January 15, 2008:

The roofing tiles are being loaded onto the roof:

Concrete curbs for the parking lot:

The guys loading the tiles on the roof, and the trash dumpster enclosure:

January 21, 2008:

First the Chancel platform is under construction. These two pictures show the framing for the Chancel area:

One of the carpenters working on the lower step that will go across the front of the Chancel platform:

This is a view of the fellowship hall area from the sanctuary doorway:

The church secretary's area is on the right, and the office where the copier and office supplies will live is on the left. The man in the yellow coat is standing in the Pastor's office.

Looking toward the back of the sanctuary from the corner of the Chancel platform. The sound booth is on the left, and the cry room is on the right. Beyond is the fellowship hall:

Back to the top of the page

February 15, 2008:

The scaffolding is being installed so that the exterior can be finished:

February 16, 2008:

Back to the top of the page

March 7, 2008:

Back to the top of the page

April 1, 2008:

Back to the top of the page

April 18, 2008:

One of the doors between the sanctuary and the hallway, plus the cabinets in the sacristy:

The chandeliers in the sanctuary:

The cabinets in the kitchen:

Back to the top of the page

April 20, 2008: New pictures of interior and exterior: